Add : No.166-8 Longxi Middle Road, Liwan District, Guangzhou City, Guangdong Province, China

ZLT-LDQ1, determination of comparative tracking index of solid electrical insulating materials,conform to IEC60112,IEC 60335-1, IEC60598-1, IEC60884-1

ZLT-LJ2, for measuring and testing the torque strain exerted by appliances with plug pins on socket-outlets, in accordance with IEC60065 clause 15.4.1 and figure 11, IEC60335-1 clause 22.3, IEC60884-1...

ZLT-I02B, Conform to the IEC60335-2-14 clause 20.2

ZLT-ZL, Flame height gauge , conform to IEC 60695-11-4 Figure 2 and IEC 60695-11-3 Figure 2

ZLT-CD1, For testing and calibrating spring-operated impact hammer, in accordance with IEC60068-2-75/1997-08 Annex B, Figure B.1 to B.4 with scale for impact energies from 0.2J to 1.2J.

Model ZLT-U04, Conforms to: UL1278 figure 8.2 (PA140A), UL398 figure 8.2 (PA170B).
Total 211 records First << Previous 11 12 [13] 14 15 16 17 18 19 20 Next >> Last